Tampere University of Technology

TUTCRIS Research Portal

BIM based schedule control for precast concrete supply chain

Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

Standard

BIM based schedule control for precast concrete supply chain. / Nissilä, J.; Heikkilä, R.; Romo, I.; Malaska, M.; Aho, T.

31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. University of Technology Sydney, 2014. p. 667-671.

Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

Harvard

Nissilä, J, Heikkilä, R, Romo, I, Malaska, M & Aho, T 2014, BIM based schedule control for precast concrete supply chain. in 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. University of Technology Sydney, pp. 667-671, 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014, Sydney, Australia, 9/07/14.

APA

Nissilä, J., Heikkilä, R., Romo, I., Malaska, M., & Aho, T. (2014). BIM based schedule control for precast concrete supply chain. In 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings (pp. 667-671). University of Technology Sydney.

Vancouver

Nissilä J, Heikkilä R, Romo I, Malaska M, Aho T. BIM based schedule control for precast concrete supply chain. In 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. University of Technology Sydney. 2014. p. 667-671

Author

Nissilä, J. ; Heikkilä, R. ; Romo, I. ; Malaska, M. ; Aho, T. / BIM based schedule control for precast concrete supply chain. 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings. University of Technology Sydney, 2014. pp. 667-671

Bibtex - Download

@inproceedings{d9e3053fed2f44029e6ae62523c9b864,
title = "BIM based schedule control for precast concrete supply chain",
abstract = "Development of the schedule control of precast concrete supply chain has been studied. Main idea was to use BIM model created by structural engineer as a user-interface for schedule control, for saving different status information of the real-time schedule situation of the propagation of structural design, element manufacture, delivery and site erection directly to the BIM model by using a cloud-based networked service. Some of the missing software applications were programmed by the software companies participated in the project. Experiments were done in a real construction project in Finland, where the information from design, prefabrication, delivery and erection phases was synchronized between the stakeholders by using the cloud service. The most important observations and results are introduced and analyzed. A future model for intelligent BIM based schedule control concept is concluded.",
keywords = "BIM, Precast concrete, Schedule control, Supply chain",
author = "J. Nissil{\"a} and R. Heikkil{\"a} and I. Romo and M. Malaska and T. Aho",
year = "2014",
language = "English",
isbn = "9780646597119",
pages = "667--671",
booktitle = "31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings",
publisher = "University of Technology Sydney",

}

RIS (suitable for import to EndNote) - Download

TY - GEN

T1 - BIM based schedule control for precast concrete supply chain

AU - Nissilä, J.

AU - Heikkilä, R.

AU - Romo, I.

AU - Malaska, M.

AU - Aho, T.

PY - 2014

Y1 - 2014

N2 - Development of the schedule control of precast concrete supply chain has been studied. Main idea was to use BIM model created by structural engineer as a user-interface for schedule control, for saving different status information of the real-time schedule situation of the propagation of structural design, element manufacture, delivery and site erection directly to the BIM model by using a cloud-based networked service. Some of the missing software applications were programmed by the software companies participated in the project. Experiments were done in a real construction project in Finland, where the information from design, prefabrication, delivery and erection phases was synchronized between the stakeholders by using the cloud service. The most important observations and results are introduced and analyzed. A future model for intelligent BIM based schedule control concept is concluded.

AB - Development of the schedule control of precast concrete supply chain has been studied. Main idea was to use BIM model created by structural engineer as a user-interface for schedule control, for saving different status information of the real-time schedule situation of the propagation of structural design, element manufacture, delivery and site erection directly to the BIM model by using a cloud-based networked service. Some of the missing software applications were programmed by the software companies participated in the project. Experiments were done in a real construction project in Finland, where the information from design, prefabrication, delivery and erection phases was synchronized between the stakeholders by using the cloud service. The most important observations and results are introduced and analyzed. A future model for intelligent BIM based schedule control concept is concluded.

KW - BIM

KW - Precast concrete

KW - Schedule control

KW - Supply chain

UR - http://www.scopus.com/inward/record.url?scp=84912527773&partnerID=8YFLogxK

M3 - Conference contribution

SN - 9780646597119

SP - 667

EP - 671

BT - 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings

PB - University of Technology Sydney

ER -