Tampere University of Technology

TUTCRIS Research Portal

Reliability and Delay Analysis of Multihop Virus-based Nanonetworks

Research output: Contribution to journalArticleScientificpeer-review

Standard

Reliability and Delay Analysis of Multihop Virus-based Nanonetworks. / Walsh, Frank; Balasubramaniam, Sasitharan.

In: IEEE Transactions on Nanotechnology, Vol. 12, No. 5, 2013, p. 674-684.

Research output: Contribution to journalArticleScientificpeer-review

Harvard

Walsh, F & Balasubramaniam, S 2013, 'Reliability and Delay Analysis of Multihop Virus-based Nanonetworks', IEEE Transactions on Nanotechnology, vol. 12, no. 5, pp. 674-684. https://doi.org/10.1109/TNANO.2013.2268389

APA

Walsh, F., & Balasubramaniam, S. (2013). Reliability and Delay Analysis of Multihop Virus-based Nanonetworks. IEEE Transactions on Nanotechnology, 12(5), 674-684. https://doi.org/10.1109/TNANO.2013.2268389

Vancouver

Walsh F, Balasubramaniam S. Reliability and Delay Analysis of Multihop Virus-based Nanonetworks. IEEE Transactions on Nanotechnology. 2013;12(5):674-684. https://doi.org/10.1109/TNANO.2013.2268389

Author

Walsh, Frank ; Balasubramaniam, Sasitharan. / Reliability and Delay Analysis of Multihop Virus-based Nanonetworks. In: IEEE Transactions on Nanotechnology. 2013 ; Vol. 12, No. 5. pp. 674-684.

Bibtex - Download

@article{8189c57fd94547579db90fef36a06134,
title = "Reliability and Delay Analysis of Multihop Virus-based Nanonetworks",
author = "Frank Walsh and Sasitharan Balasubramaniam",
note = "Contribution: organisation=elt,FACT1=1<br/>Portfolio EDEND: 2013-12-29<br/>Publisher name: Institute of Electrical and Electronics Engineers IEEE",
year = "2013",
doi = "10.1109/TNANO.2013.2268389",
language = "English",
volume = "12",
pages = "674--684",
journal = "IEEE Transactions on Nanotechnology",
issn = "1536-125X",
publisher = "Institute of Electrical and Electronics Engineers",
number = "5",

}

RIS (suitable for import to EndNote) - Download

TY - JOUR

T1 - Reliability and Delay Analysis of Multihop Virus-based Nanonetworks

AU - Walsh, Frank

AU - Balasubramaniam, Sasitharan

N1 - Contribution: organisation=elt,FACT1=1<br/>Portfolio EDEND: 2013-12-29<br/>Publisher name: Institute of Electrical and Electronics Engineers IEEE

PY - 2013

Y1 - 2013

U2 - 10.1109/TNANO.2013.2268389

DO - 10.1109/TNANO.2013.2268389

M3 - Article

VL - 12

SP - 674

EP - 684

JO - IEEE Transactions on Nanotechnology

JF - IEEE Transactions on Nanotechnology

SN - 1536-125X

IS - 5

ER -