Safety, Space and Structure Quality Requirements in Construction Scheduling
Research output: Contribution to journal › Article › Scientific › peer-review
Details
Original language | English |
---|---|
Pages (from-to) | 407-414 |
Number of pages | 8 |
Journal | Procedia Economics and Finance |
Volume | 21 |
DOIs | |
Publication status | Published - 2015 |
Publication type | A1 Journal article-refereed |
Event | Nordic Conference on Construction Economics and Organization - Duration: 1 Jan 1900 → … |
Abstract
Abstract Quality assessment of a construction project schedule can be a challenging task for project stakeholders. A little research work has addressed quality of schedules though a good project schedule can be considered as of the key factors of project success. The development of a reliable and easy to perform construction schedule quality assessment procedure seems to be a challenging task. Since Schedule Health Assessment of a construction project has to be strictly related to process requirements, it is used the3 “S” rule as a starting point and framework for obtaining improved understanding of quality of construction schedules. The 3 “S” are Safety, Space and Structure, meaning that the planned process should provide a safe working environment to construction workers, sufficient space to perform construction activities and the required sequence of construction operations and project phases.The aim of the study is to implement a schedule quality assessment method that takes into account the 3“S” rule of construction process.The 3“S” requirements can be successfully integrated in a Schedule Health Assessment method, but to facilitate their implementation and control a flow-line chart is needed,thus the schedule tool becomes a new requirement for construction schedule quality control.
Keywords
- Construction management, Project Control, Project Scheduling, Quality, Safety.