TUTCRIS - Tampereen teknillinen yliopisto

TUTCRIS

A model for scheduling of employees using supplier selection

Tutkimustuotos

Standard

A model for scheduling of employees using supplier selection. / Holopainen, Sami.

Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014. toim. / H.C. Rodrigues; J. Herskovits; C.M. Mota Soares; J.M. Guedes; A.L. Araújo; J.O. Folgado; F. Moleiro; J.F.A. Madeira. The Netherlands : CRC Press/Balkema, 2014. s. 533-538.

Tutkimustuotos

Harvard

Holopainen, S 2014, A model for scheduling of employees using supplier selection. julkaisussa HC Rodrigues, J Herskovits, CM Mota Soares, JM Guedes, AL Araújo, JO Folgado, F Moleiro & JFA Madeira (toim), Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014. CRC Press/Balkema, The Netherlands, Sivut 533-538, International Conference on Engineering Optimization, 1/01/14. https://doi.org/10.1201/b17488-96

APA

Holopainen, S. (2014). A model for scheduling of employees using supplier selection. teoksessa H. C. Rodrigues, J. Herskovits, C. M. Mota Soares, J. M. Guedes, A. L. Araújo, J. O. Folgado, F. Moleiro, ... J. F. A. Madeira (Toimittajat), Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014 (Sivut 533-538). The Netherlands: CRC Press/Balkema. https://doi.org/10.1201/b17488-96

Vancouver

Holopainen S. A model for scheduling of employees using supplier selection. julkaisussa Rodrigues HC, Herskovits J, Mota Soares CM, Guedes JM, Araújo AL, Folgado JO, Moleiro F, Madeira JFA, toimittajat, Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014. The Netherlands: CRC Press/Balkema. 2014. s. 533-538 https://doi.org/10.1201/b17488-96

Author

Holopainen, Sami. / A model for scheduling of employees using supplier selection. Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014. Toimittaja / H.C. Rodrigues ; J. Herskovits ; C.M. Mota Soares ; J.M. Guedes ; A.L. Araújo ; J.O. Folgado ; F. Moleiro ; J.F.A. Madeira. The Netherlands : CRC Press/Balkema, 2014. Sivut 533-538

Bibtex - Lataa

@inproceedings{42c8c9f8e9ba403ca1ce22f3f6c712f4,
title = "A model for scheduling of employees using supplier selection",
author = "Sami Holopainen",
note = "Contribution: organisation=mei,FACT1=1<br/>Portfolio EDEND: 2015-01-09",
year = "2014",
doi = "10.1201/b17488-96",
language = "English",
isbn = "978-1-138-02725-1",
pages = "533--538",
editor = "H.C. Rodrigues and J. Herskovits and {Mota Soares}, C.M. and J.M. Guedes and A.L. Ara{\'u}jo and J.O. Folgado and F. Moleiro and J.F.A. Madeira",
booktitle = "Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014",
publisher = "CRC Press/Balkema",

}

RIS (suitable for import to EndNote) - Lataa

TY - GEN

T1 - A model for scheduling of employees using supplier selection

AU - Holopainen, Sami

N1 - Contribution: organisation=mei,FACT1=1<br/>Portfolio EDEND: 2015-01-09

PY - 2014

Y1 - 2014

U2 - 10.1201/b17488-96

DO - 10.1201/b17488-96

M3 - Conference contribution

SN - 978-1-138-02725-1

SP - 533

EP - 538

BT - Engineering optimization IV, Proceedings of the International Conference on Engineering Optimiztion (ENGOPT 2014), Lisbon, Portugal, 8-11 September 2014

A2 - Rodrigues, H.C.

A2 - Herskovits, J.

A2 - Mota Soares, C.M.

A2 - Guedes, J.M.

A2 - Araújo, A.L.

A2 - Folgado, J.O.

A2 - Moleiro, F.

A2 - Madeira, J.F.A.

PB - CRC Press/Balkema

CY - The Netherlands

ER -