Ensuring functionality of a nearly zero-energy building with procurement methods. / Kantola, Mikko; Saari, Arto.

julkaisussa: Facilities, Vuosikerta 32, Nro 7-8, 2014, s. 312-323.

Tutkimustuotosvertaisarvioitu

Harvard

APA

Vancouver

Author

Kantola, Mikko ; Saari, Arto. / Ensuring functionality of a nearly zero-energy building with procurement methods. Julkaisussa: Facilities. 2014 ; Vuosikerta 32, Nro 7-8. Sivut 312-323.

Bibtex - Lataa

@article{05d4a93933af4215911145f7bdea78ca,
title = "Ensuring functionality of a nearly zero-energy building with procurement methods",
abstract = "Purpose: The purpose of this paper is to show the results of the task given by a major research program concerning low-energy building and indoor environment. The task was to develop contracting document model layouts to be used in zero-energy building (ZEB) and nearly zero-energy building (nZEB) construction projects. Design/methodology/approach: A workshop method was chosen for gathering information and developing the layouts. Findings: In the debate in the workshop three main topics arose: the selection of project delivery system, the use of performance controller for the heating, ventilation and air-conditioning (HVAC) systems and making innovation possible by making the call for bids as loose as possible. Research limitations/implications: The use of performance controller could be investigated more, and more accurate information and knowledge about the best practices on nZEB construction can be captured as the industry moves in that direction and more projects will appear. Originality/value: The goals of the research program were met and also the main issues of nZEB construction contracting were documented, which can be utilized by the whole industry of house building.",
keywords = "Contracting, Energy efficiency, Indoor environment, Procurement, Zero-energy building",
author = "Mikko Kantola and Arto Saari",
year = "2014",
doi = "10.1108/F-05-2012-0040",
language = "English",
volume = "32",
pages = "312--323",
journal = "Facilities",
issn = "0263-2772",
publisher = "Emerald",
number = "7-8",

}

RIS (suitable for import to EndNote) - Lataa

TY - JOUR

T1 - Ensuring functionality of a nearly zero-energy building with procurement methods

AU - Kantola, Mikko

AU - Saari, Arto

PY - 2014

Y1 - 2014

N2 - Purpose: The purpose of this paper is to show the results of the task given by a major research program concerning low-energy building and indoor environment. The task was to develop contracting document model layouts to be used in zero-energy building (ZEB) and nearly zero-energy building (nZEB) construction projects. Design/methodology/approach: A workshop method was chosen for gathering information and developing the layouts. Findings: In the debate in the workshop three main topics arose: the selection of project delivery system, the use of performance controller for the heating, ventilation and air-conditioning (HVAC) systems and making innovation possible by making the call for bids as loose as possible. Research limitations/implications: The use of performance controller could be investigated more, and more accurate information and knowledge about the best practices on nZEB construction can be captured as the industry moves in that direction and more projects will appear. Originality/value: The goals of the research program were met and also the main issues of nZEB construction contracting were documented, which can be utilized by the whole industry of house building.

AB - Purpose: The purpose of this paper is to show the results of the task given by a major research program concerning low-energy building and indoor environment. The task was to develop contracting document model layouts to be used in zero-energy building (ZEB) and nearly zero-energy building (nZEB) construction projects. Design/methodology/approach: A workshop method was chosen for gathering information and developing the layouts. Findings: In the debate in the workshop three main topics arose: the selection of project delivery system, the use of performance controller for the heating, ventilation and air-conditioning (HVAC) systems and making innovation possible by making the call for bids as loose as possible. Research limitations/implications: The use of performance controller could be investigated more, and more accurate information and knowledge about the best practices on nZEB construction can be captured as the industry moves in that direction and more projects will appear. Originality/value: The goals of the research program were met and also the main issues of nZEB construction contracting were documented, which can be utilized by the whole industry of house building.

KW - Contracting

KW - Energy efficiency

KW - Indoor environment

KW - Procurement

KW - Zero-energy building

UR - http://www.scopus.com/inward/record.url?scp=84940280901&partnerID=8YFLogxK